Photovoltaic System

Sustainability starts from the production process

Treemme's energy commitment

For Rubinetterie Treemme, sustainability regards not just the products themselves, but the entire manufacturing process. The company has invested in a 520.27 kWh photovoltaic plant, able to cover a significant portion of its daily energy requirements.

The rest of the energy used comes from renewable sources, such as the Buseto Wind Farm. This choice underscores Treemme's commitment to a low-environmental-impact production model, at every stage of the process.

At the same time, Treemme's production process uses materials and technologies with a lower environmental impact, such as steel and PVD finishes, which are more sustainable than traditional treatments.

Impianto Fotovoltaico Treemme

Three directions of energy efficiency

Our actions

Photovoltaic Energy

The 520.27 kWh plant installed on the roof of the Asciano facility produces clean energy directly where it is used, reducing both dependence on the grid and CO₂ emissions derived from the manufacturing process.

Production Efficiency

Every stage of production is monitored to minimise energy consumption and maximise output per unit produced.

Renewable Sources & Materials

The energy not covered by the photovoltaic plant comes from renewable sources, such as the Buseto Wind Farm. At the same time, the production process uses materials and technologies with a lower environmental impact, such as steel and PVD finishes, which are more sustainable than traditional treatments.

"Every solar panel is a choice. We choose to bring beauty to the world, instead of taking it away."